ADVERTISEMENT

ADVERTISEMENT

A closer look

111020.N.BD.WashingtonStreetbridgeinspection1.jpg
Minnesota Department of Transportation employee Justin Gilbertson (left) works with a consultant Monday, Nov. 9, to draw samples from the concrete on a span of the Washington Street Bridge in Brainerd. MnDOT will complete an engineering study by the end of 2021 to find the long-term needs for the Highway 210/Washington Street bridge over the Mississippi River. Major preservation work will be done to the bridge structure in 2025. Steve Kohls / Brainerd Dispatch
I was raised on a farm in western Minnesota where I participated in 4-H, high school sports, and everything that farm kids do for fun after chores. Graduated from Ridgewater Community College with an AA degree and my first taste of newspapering. I worked a summer on the Ortonville Independent as a reporter and photographer.
What To Read Next
Get Local

ADVERTISEMENT