ADVERTISEMENT

ADVERTISEMENT

Proposed U.S. nuclear power reactors

Sept 16 (Reuters) - The U.S. Nuclear Regulatory Commission on Tuesday approved GE Hitachi Nuclear Energy's Economic Simplified Boiling Water Reactor (ESBWR) design, allowing power companies to use it in nuclear plants they may build.

Sept 16 (Reuters) - The U.S. Nuclear Regulatory Commission on Tuesday approved GE Hitachi Nuclear Energy's Economic Simplified Boiling Water Reactor (ESBWR) design, allowing power companies to use it in nuclear plants they may build.

To date, two power companies have already picked the ESBWR technology for planned reactors. DTE Energy Corp will use it for a project in Michigan, and Dominion Resources Inc, for one in Virginia.

GE Hitachi, a venture of conglomerates General Electric Co of the United States and Hitachi Ltd of Japan, said it expected the final design certification rule to be published in the Federal Register by the end of September.

The following lists the proposed U.S. new nuclear plants and reactor designs.

LICENSE
REACTOR(S) COMPANY DESIGN SIZE STATE DECISION
(megawatts)

ADVERTISEMENT

Vogtle (2) Southern AP1000 2,234 GA Approved 2012
Summer (2) Scana AP1000 2,234 SC Approved 2012
* Levy (2) Duke AP1000 2,234 FL 2015
Fermi (1) DTE ESBWR 1,600 MI 2015
* South Texas (2) STP STP ABWR 2,700 TX 2016
* Lee (2) Duke AP1000 2,234 SC 2016
* North Anna (1) Dominion ESBWR 1,600 VA 2016
Turkey Point (2) NextEra AP1000 2,234 FL Being Revised
++ Hope Creek PSEG NJ Not Scheduled
* Calvert (1) UniStar EPR 1,650 MD Not Scheduled
* Bell Bend (1) PPL EPR 1,650 PA Not Scheduled
* Clinch River TVA mPower 180 TN Not Received
* Callaway Ameren Westinghouse DC 225 MO Not Received
* ++ Blue Castle Blue Castle AP1000 2,234 UT Not Received
Callaway (1) Ameren EPR MO Suspended 2009
Nine Mile Pt (1) UniStar EPR NY Suspended 2009
Grand Gulf (1) Entergy ESBWR MS Suspended 2009
River Bend (1) Entergy ESBWR LA Suspended 2009
Bellefonte (2) TVA AP1000 AL Suspended 2010
Harris (2) Duke AP1000 NC Suspended 2013
* Comanche Peak (2) Luminant USAPWR TX Suspended 2014
Total 23,009

CERTIFICATION
COMPANY DESIGN DECISION

Westinghouse AP1000 1,117 Approved 2011
Toshiba STP ABWR 1,350 Approved 2012
* GE-Hitachi ESBWR 1,600 Approved 2014
* Areva EPR 1,650 Not Scheduled
* Mitsubishi Heavy USAPWR 1,700 Not Scheduled
Toshiba ABWR - Renewal 1,380 Not Scheduled
GE-Hitachi ABWR - Renewal 1,500 Not Scheduled
* Korea Hydro & APR-1400 1,400 Not Received
Nuclear
* B&W mPower SMR 180 Not Received
* NuScale Power NuScale SMR 45 Not Received
* Westinghouse DC Westinghouse SMR 225 Not Received
* Holtec DC Holtec SMR 160 Not Received
* X-Energy DC XE 100 SMR Not Received
* Change to list

** Companies (PSEG and Blue Castle) seeking Early Site Permits that have not announced reactor technology

Reactor Design Abbreviations: ABWR - Advanced Boiling Water Reactor built by Toshiba Corp

AP1000 - Advanced Passive 1000 built by Westinghouse Electric, which is majority owned by Toshiba

EPR - Evolutionary Power Reactor built by Areva SA

ESBWR - Economic Simplified Boiling Water Reactor built by General Electric and Hitachi Ltd

ADVERTISEMENT

USAPWR - U.S. Advanced Pressurized Water Reactor built by Mitsubishi Heavy Industries

mPower - Babcock & Wilcox small modular reactor

APR-1400 - Advanced Power Reactor-1400 built by the Korea Hydro & Nuclear Power (KHNP) unit of Korea Electric Power Corp (KEPCO)

What To Read Next
Get Local

ADVERTISEMENT